Connect with us

GENERAL

Achimota overhead gradually becoming a ticking time-bomb.

Published

on

 

 

The Achimota overhead bridge is gradually becoming a ticking time-bomb as the under part of the bridge is being chipped away in bits.

A visit by GhanaWeb’s road safety team to the overhead bridge, exposed iron rods indicating how the structural integrity of the bridge is gradually being compromised.

Speaking to some commuters and drivers around the area, they disclosed that the situation is as a result of the failure of heavy-duty trucks to comply to the height limit directions for the structure. They force their way under the bridge with load exceeding height limits of more than 5 meters.

According to those who spoke to GhanaWeb, majority of culpable cars are those usually transporting goods from the Tema Port to far away Burkina Faso and other neigbouring countries.

They expressed concerns that the gradual chipping of the bridge poses the ultimate risk of a possible collapse of the structure, a situation that could lead to injuries, loss of lives and properties. They have therefore called on the National Road Safety Commission, the Ghana Highway Authority and other relevant state institutions to take appropriate steps to avert any impending danger.

Advertisement